| Property | Value |
| Name | NCDOT Exit 105 Sterling Street Construction Plans |
| Description |
The North Carolina Department of Transportation has started work on the Sterling Street and I-40 Exit 105 interchange. City staff have simplified the plans into a document for residents to compare the current interchange with the future interchange. Download and view this PDF compiled from NCDOT construction plans to see the current roadways and planned roadways, or just click on one of the images below. Sterling Street will be widened to six lanes through the interchange and the I-40 bridges over Sterling Street will be replaced. The PDF contains five layers: Labels, NCDOT Existing Layout, NCDOT Prop Right-of-Way, and NCDOT Proposed Layout. The Existing Layout shows the current roadway. The Proposed Layout shows the planned changes. For questions about the project, visit http://www.ncdot.org/projects/search/details.html#id=1896.
|
| Filename | 20110921-NCDOT_Exit_105_Plans.pdf |
| Filesize | 124.62 kB |
| Filetype | pdf (Mime Type: application/pdf) |
| Hits | 1462 Hits |
| Last updated on | 02/01/2012 16:03 |
Year-round outdoor adventures and plenty of vacation venues to help you recharge, refresh and relax in Nature's Playground.







City of Morganton • 305 E. Union St. Suite A100, Morganton, NC 28655 • (828) 437-8863